*Loading images, Please wait... *
This may take some time depending on the file size and your internet connection

Don't forget to bookmark this page.

Sunday, March 29, 2009

P&O building



The former P&O building in downtown London was taken apart from the bottom up. Each floor was hung from a central beam on the roof, so the beam was removed last, followed by the demolition of the central core. If the building had been demolished before the removal of the floors, the surrounding building could have been harmed.

0 comments:

Blog Widget by LinkWithin